{"id":"5s3r5j0s0b","reading":"2c233b1k43","url":"https://read.dearwise.earth/land/5s3r5j0s0b","name":"Bejuco, Guanacaste","place":{"country":"Costa Rica","country_iso":"CR","region":"Guanacaste"},"area_ha":1942.9,"centroid":[-85.2398,9.84187],"geometry":{"type":"Polygon","coordinates":[[[-85.221719742,9.807518479],[-85.2171278,9.847266963],[-85.231246948,9.871705677],[-85.249700546,9.86790046],[-85.259742737,9.86109324],[-85.249400139,9.854116751],[-85.247254372,9.833313252],[-85.244121552,9.819612672],[-85.237855911,9.814326803],[-85.221719742,9.807518479]]]},"score":64,"verdict":"Restore","headline":"The water is willing. Follow it.","summary":"This 1,943-hectare parcel near Bejuco, Nandayure, Guanacaste is land with sound foundations and clear regenerative upside, scoring 64 out of 100. The reading that most shapes the work here is that a meaningful share of this land's tree cover has been cleared since 2000. Its main strength is that most of the parcel reads as tree cover. The first move: build a water budget sized to the projected dry spell, not the annual average.","pillars":[{"label":"Water","value":89},{"label":"Ecology","value":77},{"label":"Climate","value":48},{"label":"Pressure","value":55},{"label":"Soil","value":42}],"figures":[{"label":"Rain","value":"2,271","unit":"mm a year"},{"label":"Elevation","value":"52","unit":"m"},{"label":"Tree cover","value":"85.8","unit":"%"},{"label":"Climate 2050","value":"+1.7","unit":"°C"},{"label":"Records of life","value":"5,575","unit":"GBIF"},{"label":"Area","value":"1,943","unit":"ha"}],"findings":[{"kind":"Strength","finding":"A watercourse runs through the parcel.","evidence":"A mapped river or stream crosses the parcel (Río Blanco).","confidence":"clear sky"},{"kind":"Risk","finding":"A meaningful share of this land's tree cover has been cleared since 2000.","evidence":"About 54.9% of the parcel lost tree cover since 2000, most recently in 2025.","confidence":"clear sky"},{"kind":"Unknown","finding":"About 14% of this ground changed character between 2017 and 2025.","evidence":"13.6% of 3,023 pixels fell below 0.8 cosine similarity from 2017 to 2025.","confidence":"in fog"}],"first_move":{"action":"Build a water budget sized to the projected dry spell, not the annual average.","verify":"Measure the springs, wells, and watercourses at the end of the dry season, when supply is at its lowest — that is the number to plan against.","then":"Design roads and structures to the contour, and get a geotechnical and erosion assessment before any earthworks."},"sources_read":["the river and road trace","the species record","Sentinel-2","the infrastructure reach","osm adaptation","the heritage record","the place's memory","the corridor reference","the place lookup","the terrain","the rain record","the soil survey","the land-cover map","the surface-water archive","the governance record","the forest history","hansen front","terra upstream","terra deforestation free","the underground atlas","ghm v3","the siting geometry","the river trace","the seismic record","modis fire history","the satellite signature","the governance record","the territory register","the forest history","the 2020 forest map","the district boundaries","dengue cr"],"sources_silent":["the radar","the thermal read","the biomass map","the population grid","the hazard screen"],"read_at":"2026-10-16T18:47:20.200Z","signature":{"sha256":"0bd02ee1d92170afe44eb690349d398fd8d6f971d6fe7ba45f562ff7a170627f","signed_at":"2026-10-16T18:47:20.437Z"},"record":[{"id":"5s3r5j0s0b","read_at":"2026-07-23T05:51:36.847Z","score":55,"verdict":"Restore"},{"id":"2c233b1k43","read_at":"2026-10-16T18:47:20.200Z","score":64,"verdict":"Restore"}],"full_reading":"https://read.dearwise.earth/api/v1/readings/2c233b1k43","note":"A first pass from orbit: not a survey, not a title search, not legal advice. Quote figures with their source and date."}