Land Intelligence Report

Piedades Sur, San Ramón, Alajuela Province

2,012 ha · 10.1299, -84.5373 · The core systems here are working; the work is stewardship.

Terrain · shaded relief — Piedades Sur, San Ramón, Alajuela Province
2.5 km
Terrain · shaded relief · AWS Terrain Tiles
Land cover · ESA WorldCover 2021 — Piedades Sur, San Ramón, Alajuela Province
2.5 km
Land cover · ESA WorldCover 2021 · ESA / Copernicus

The reading in full

This 2,012-hectare parcel near Piedades Sur, San Ramón, Alajuela Province is ecologically strong land whose work is stewardship, not repair. It scores 77 out of 100 on the Dear Wise Earth Land Score.

The risks that most shape a decision here: The terrain is steep, which constrains construction and raises erosion risk. Steep slopes increase building and road costs, limit machinery access, and make the land more prone to erosion and landslides.

Where the upside lies: Most of the parcel reads as tree cover. Tree cover can carry real conservation and carbon value, but satellite land-cover cannot tell natural forest from a monoculture plantation (oil palm, rubber, teak). Confirm which it is before assuming biodiversity or carbon value.

The wider readings: Models project a warmer and drier climate here by 2050. Expect a warmer and drier future here; favour species and infrastructure that tolerate the projected range. Rainfall is high and supports rain-fed use. There is enough water for most crops and forestry with little or no irrigation; dry-season storage still helps. The area has a rich record of documented wildlife. High biodiversity adds conservation value, may bring species-protection rules, and can support eco-tourism or habitat-credit programs. Soil organic carbon is moderate. The soil is workable but will benefit from cover cropping and organic inputs to build fertility before intensive use. Official Costa Rican record places this in Ángeles, San Ramón, Alajuela. National cadastral and administrative data ground the parcel in the legal record — the basis for title, permitting, and tax diligence.

What the land is telling us: Read across the record, the land reads as stable to regenerating: the core cover and water signals are holding, which means the work is to build on a sound base rather than to reverse a decline. Of the land's core processes, the water cycle reads as adequate to abundant, so the question is less supply than how well the land captures and holds what falls and community dynamics look rich, with a deep record of documented life nearby. What orbit cannot see is what happens below the surface — soil biology, structure, and the carbon held in the ground — so treat those as the first things to confirm underfoot. Taken together, this is ecologically strong land whose work is stewardship, not repair. Its clearest strength to build from is that most of the parcel reads as tree cover.

77Land Score

The core systems here are working; the work is stewardship.

Piedades Sur, San Ramón, Alajuela Province

Five readings

The parcel from orbit

Finding the latest clear satellite pass…

Reading the place

This 2,012-hectare parcel near Piedades Sur, San Ramón, Alajuela Province is ecologically strong land whose work is stewardship, not repair, scoring 77 out of 100. The reading that most shapes the work here is that the terrain is steep, which constrains construction and raises erosion risk. Its main strength is that most of the parcel reads as tree cover. The first move: design roads and structures to the contour, and get a geotechnical and erosion assessment before any earthworks.

Riskhigh confidence

The terrain is steep, which constrains construction and raises erosion risk.

Steep slopes increase building and road costs, limit machinery access, and make the land more prone to erosion and landslides.

Mean slope 4°, with 377 m of elevation change across the parcel.

Opportunitylow confidence

Most of the parcel reads as tree cover.

Tree cover can carry real conservation and carbon value, but satellite land-cover cannot tell natural forest from a monoculture plantation (oil palm, rubber, teak). Confirm which it is before assuming biodiversity or carbon value.

64% of the parcel reads as tree cover (satellite land-cover mapping). Naturalness is not verified.

Climatemedium confidence

Models project a warmer and drier climate here by 2050.

Expect a warmer and drier future here; favour species and infrastructure that tolerate the projected range.

Projected change by 2050: +1.2 °C mean temperature, -0.5% rainfall. Exposure rated Moderate.

Waterhigh confidence

Rainfall is high and supports rain-fed use.

There is enough water for most crops and forestry with little or no irrigation; dry-season storage still helps.

2,937 mm of rain per year. The archive's 20-year trend reads about +48% — a swing that size deserves verification against local records before it informs any plan.

Biodiversityhigh confidence

The area has a rich record of documented wildlife.

High biodiversity adds conservation value, may bring species-protection rules, and can support eco-tourism or habitat-credit programs.

18,430 biodiversity records nearby, including Cantorchilus modestus and Basileuterus rufifrons (GBIF).

Soilmedium confidence

Soil organic carbon is moderate.

The soil is workable but will benefit from cover cropping and organic inputs to build fertility before intensive use.

33.9 g/kg soil organic carbon in the top 30 cm, clay loam texture, pH 5.5 (ISRIC SoilGrids).

Accessmedium confidence

Official Costa Rican record places this in Ángeles, San Ramón, Alajuela.

National cadastral and administrative data ground the parcel in the legal record — the basis for title, permitting, and tax diligence.

Jurisdiction: Ángeles, San Ramón, Alajuela. Source: SNIT.

Confidence reflects the data behind each reading: high when clear passes or strong sources agree, medium on a partial or single-source signal, low where the data is sparse or indirect. A low-confidence reading usually needs one more clear pass, or a check on the ground.

What the land is telling us

Read across the record, the land reads as stable to regenerating: the core cover and water signals are holding, which means the work is to build on a sound base rather than to reverse a decline.

Of the land's core processes, the water cycle reads as adequate to abundant, so the question is less supply than how well the land captures and holds what falls and community dynamics look rich, with a deep record of documented life nearby. What orbit cannot see is what happens below the surface — soil biology, structure, and the carbon held in the ground — so treat those as the first things to confirm underfoot.

Taken together, this is ecologically strong land whose work is stewardship, not repair. Its clearest strength to build from is that most of the parcel reads as tree cover.

Where the capital goes · corridor & deployment

84Conservation priority
KeystoneCore habitat

High-value corridor land to secure before it is lost.

high-value connectivity land to secure now

Within the Corredor Biológico Montes del Aguacate (screening) · Área de Conservación Pacífico Central (ACOPAC)

Inside the Corredor Biológico Montes del Aguacate, this reads as intact habitat to secure, scoring 84 out of 100 for conservation priority. It is a keystone: high-value connectivity land to secure now, before it turns over. A small, low-footprint operation (fit 80/100) could fund the work from the already-worked ground.

80/100
Hospitality fit

The funding layer: a small, low-footprint operation sited on the already-worked ground, sized to carry the restoration — never spending the habitat it depends on.

Corridormedium confidence

The parcel falls within the Corredor Biológico Montes del Aguacate (screening).

This is a declared biological corridor in Área de Conservación Pacífico Central (ACOPAC) — land inside it carries a national connectivity mandate and is where conservation capital compounds, joining protected areas rather than standing alone. The corridor links Cordillera Volcánica Central, Cerros de Turrubares, Pacífico Central.

Centroid inside the PNCB screening extent for this corridor. Extent is approximate — confirm the parcel against the official SINAC/PNCB record.

Conservationmedium confidence

This reads as intact habitat — the priority is to secure it, not rebuild it.

Standing natural forest is far cheaper to protect than to restore, and holding it inside a corridor keeps the connection open. Securing tenure and legal protection is where capital does the most here.

64% tree cover.

Hospitalitymedium confidence

A small hospitality operation could carry the conservation here.

In the regenerative model the lodging is a means, not the end: a low-footprint operation sited on the already-worked ground earns the revenue that funds the restoration and stewardship, while the core is left to recover. Kept small, it also gives the corridor local guardians with a reason to hold it.

Hospitality fit 80/100, drawing on standing forest, protected land alongside, relief for views. Site any building on the disturbed matrix, not the habitat.

Capital moves

  1. 01

    Secure this land first — through purchase, or a conservation easement that survives a change of owner.

    Before committing

    Intact corridor habitat holds its value only while it stays intact; locking in protection before the land turns over is the move capital cannot undo.

    Confirm on the ground · Confirm title and boundaries with a local lawyer, then scope a servidumbre ecológica (ecological easement) and FONAFIFO's PSA forest-protection payment against the parcel.

  2. 02

    Protect the standing forest and remove the active threats to it.

    First visit

    The habitat is already here; the work is to keep it — stopping clearing, fire, and hunting pressure holds far more value than any planting would add.

    Confirm on the ground · Walk the boundary for signs of encroachment, fire, and hunting; agree the protection terms with neighbours who share the edge.

  3. 03

    Site a small, low-footprint hospitality operation on the already-worked ground to fund the stewardship.

    Once the land is secured

    A modest operation on the disturbed matrix earns the revenue that pays for the restoration and the guardians, without spending the habitat it depends on.

    Confirm on the ground · Model the operation at a size the land can carry, keep it off the habitat, and check the Certificado de Sostenibilidad Turística (CST) and local zoning before designing anything.

  4. 04

    Set a connectivity baseline and re-read it — camera traps and the species the corridor was declared for.

    Ongoing

    Funders and partners judge a corridor by whether wildlife actually moves through it; a repeatable baseline is what turns the thesis into evidence and steers the next round of capital.

    Confirm on the ground · Run camera traps and species counts on a fixed schedule — track the indicator species named for this corridor (A piedmont corridor tying the central volcanic range to the Pacific slope across the Aguacate hills).

The deployment reading is a screening lens layered on the Land Score — it points capital at the land where it builds the most connectivity, and each move is paired with the ground-truth step that confirms it. Corridor extents are approximate PNCB screening footprints; confirm a parcel against the official SINAC/PNCB record.

Best-fit regenerative model

Corridor anchor reserve

72/100 fit

Protect the keystone; hold the connection open.

With 64% tree cover inside a declared biological corridor and a conservation priority of 84, the leverage here is protection: secure the core so the connection it anchors stays open.

High-value habitat inside the connectivity network. The move is to secure it — purchase or easement — so the corridor it anchors stays unbroken.

1,104 m elevation64% forest3.5° slope2,937 mm rain/yrinside a corridor

Also consider · Ecolodge / retreat (65) · Regenerative agroforestry estate (39)

A published, rules-based suggestion read from the parcel's own indicators — forest, water, slope, access, and its place in the network. It names the shape of project the land is already set up to carry; confirm it against tenure, soils, and what you know from the ground.

What to do

  1. 01

    Design roads and structures to the contour, and get a geotechnical and erosion assessment before any earthworks.

    Before committing

    Steep ground raises building and access costs and erosion risk; the terrain sets the layout, not the other way round.

    Confirm on the ground · Have a geotechnical engineer assess slope stability and cut-and-fill on the ground before a road line is committed.

  2. 02

    Ground-truth what the canopy actually is before assuming forest value.

    First visit

    Satellite land-cover cannot separate natural forest from a monoculture plantation, and the difference decides the conservation and carbon value.

    Confirm on the ground · Walk the stand: one species in rows is plantation; mixed ages and species with natural regeneration is forest. A botanist can confirm.

  3. 03

    Visit the land to confirm the reading and protect what already works.

    First visit

    The core systems read as sound; the priority is to keep them that way and avoid degrading them.

    Confirm on the ground · Walk the parcel with the reading in hand and note where the ground agrees and disagrees with it.

Questions to sit with

  • Standing under the canopy, is it one species or many — and which parts would you protect rather than replant?
  • Are you here to hold this land as it is, to work it, or to help it change — and does the reading above serve that intention?
  • If the work succeeds, what do the water, the canopy, and the people around this land look like a generation from now — and what is the first condition that has to change for that to begin?
  • Where does this reading disagree with what you have seen walking the land? That disagreement is the first thing to check on the ground.

These are not data gaps — they are the questions the data cannot answer.

Reading the land's record…

Climate · to 2050

19.9°C
Mean temp
+1.2°C
2050 Δ temp
-1%
2050 Δ rain

Exposure · Moderate

2050 sits within a single planning horizon — about 24 years out. The models expect seasons here about 1.2°C warmerthan today's, with 1% less rain. Expect is the honest verb: this is the middle of a range of futures, not a certainty — so design to the range, not to today.

Water

2,937mm/yr
Rainfall
+47.7%
20-yr trend
km
To watercourse

Soil · 0–30 cm

33.9g/kg
Org. carbon
5.5
pH
38%
Sand
35%
Clay

Clay loam

Terrain & cover

1,104m
Elevation
3.5°
Mean slope
64%
Forest
3%
Built
Tree cover 64%Grassland 33%Built-up 3%

Ecology

18,430
Recorded wildlife observations
GBIF

Cantorchilus modestus · Basileuterus rufifrons · Turdus grayi · Psilorhinus morio

Pressure

Source unavailable for this parcel.

Forest history · since 2000

48%
Tree cover 2000
2.9%
Cover lost
2023
Latest loss

Hansen Global Forest Change GFC-2023-v1.11

Costa Rica ecological corridor

Within
Corridor
screening extent
Área de Conservación Pacífico Central (ACOPAC)
Conservation area

Corredor Biológico Montes del Aguacate

A piedmont corridor tying the central volcanic range to the Pacific slope across the Aguacate hills.

Connects · Cordillera Volcánica Central · Cerros de Turrubares · Pacífico Central

PNCB / SINAC — Corredores Biológicos (screening reference) · approximate screening extent — confirm against the official SINAC / PNCB record

See the corridor network →

Costa Rica land record

Ángeles, San Ramón, Alajuela
Jurisdiction

SNIT Costa Rica (IGN / IDECORI) · official national data — verify title & permits locally

Talk it through with Gregorio

This reading is built from satellite and open data. It cannot see soil biology, legal tenure, or what you already know from walking the land — a 30-minute call tests the reading against the ground and sequences the work. No cost, no obligation.

Sources & method · 10 layers
Biodiversity — GBIF

Occurrence records (count + top species)

point · live
Mixed CC0 / CC-BY / CC-BY-NC (per dataset)
Costa Rica territorial record — SNIT

Administrative units, cadastral parcels, agrological land-capability, protected areas, Holdridge life zones (WFS)

vector (1:5 000 base) · national SDI (rolling)
SNIT Condiciones Generales de Uso (attribution)
Ecological corridors — PNCB / SINAC (Costa Rica)

Declared biological corridors (bundled screening reference of official corridors; approximate extents — confirm against SINAC/PNCB)

screening extent · PNCB (rolling)
Public programme (SINAC); reference compiled for screening
Place — OpenStreetMap / Nominatim

Nominatim reverse geocode

settlement · live
ODbL 1.0
Terrain — AWS Terrarium (Mapzen)

Terrarium elevation tiles

~10 m (z12) · 2017
Open (attribution)
Climate — Open-Meteo

Archive 2004–2024 + MPI-ESM1-2-XR to 2050

~9 km · 2004–2024 / 2045–2049
CC-BY 4.0 (data); non-commercial API tier
Soil — ISRIC SoilGrids v2

SoilGrids v2.0 (SOC, pH, sand, clay; 0–30 cm)

250 m · 2020
CC-BY 4.0
Land cover — ESA WorldCover

WorldCover 2021 v200

10 m · 2021
CC-BY 4.0 (commercial promotion: notify due@esa.int)
Surface water — JRC Global Surface Water

Global Surface Water v1.4 — occurrence & seasonality

30 m · 1984–2021
Copernicus / open (attribution)
Forest loss — Hansen Global Forest Change

Global Forest Change (tree cover 2000 + annual loss)

~30 m · 2000–2023
CC-BY 4.0

Every number above is public, open data — named, dated, and licensed. What TERRA does not publish is the lens: the weights, curves, and verdict thresholds that turn these layers into a Land Score. That judgment is calibrated from land walked on the ground, and it stays proprietary.

Unavailable for this parcel: osm_overpass, sentinel2_ndvi, sentinel1_rtc, worldbank_wgi, landsat_lst — the affected pillars were reweighted, not guessed.

Generated Thu, 30 Jul 2026 17:38:04 GMT · 15.9s · synthesized by TERRA.

Generated Thu, 30 Jul 2026 17:38:04 GMT · synthesized by TERRA · Dear Wise Earth.