Land Intelligence Report

Ángeles, San Ramón, Alajuela Province

8 ha · 10.1888, -84.4856 · Workable land — the plan must come before the capital.

Terrain · shaded relief — Ángeles, San Ramón, Alajuela Province
250 m
Terrain · shaded relief · AWS Terrain Tiles
Land cover · ESA WorldCover 2021 — Ángeles, San Ramón, Alajuela Province
250 m
Land cover · ESA WorldCover 2021 · ESA / Copernicus

The reading in full

This 8-hectare parcel near Ángeles, San Ramón, Alajuela Province is workable land whose plan must come before the capital. It scores 47 out of 100 on the Dear Wise Earth Land Score.

Where the upside lies: The soil is rich in organic carbon, a strong base for farming and restoration. Carbon-rich soil holds water and nutrients well, supports higher yields and faster regrowth, and may qualify for soil-carbon programs.

The wider readings: The land is gently rolling. Gentle terrain is generally workable with only minor grading for buildings or roads. Little wildlife has been formally recorded here. A low record count usually reflects limited survey effort rather than low biodiversity, so a ground survey is needed before drawing conclusions. The parcel is relatively remote. Distance from roads and towns means lower encroachment pressure and more privacy, but higher transport and operating costs.

What the land is telling us: Read across the record, the land reads as stable to regenerating: the core cover and water signals are holding, which means the work is to build on a sound base rather than to reverse a decline. Of the land's core processes, community dynamics are barely recorded here — an absence of data, not necessarily of life. What orbit cannot see is what happens below the surface — soil biology, structure, and the carbon held in the ground — so treat those as the first things to confirm underfoot. Taken together, this is workable land whose plan must come before the capital. Its clearest strength to build from is that the soil is rich in organic carbon, a strong base for farming and restoration.

47Land Score

Workable land — the plan must come before the capital.

Ángeles, San Ramón, Alajuela Province

Three of five readings

water, climate_resilience unavailable — weight redistributed across the rest.

The parcel from orbit

Finding the latest clear satellite pass…

Reading the place

This 8-hectare parcel near Ángeles, San Ramón, Alajuela Province is workable land whose plan must come before the capital, scoring 47 out of 100. Its main strength is that the soil is rich in organic carbon, a strong base for farming and restoration. The first move: carry out a field biodiversity survey to see what the records miss.

Opportunitymedium confidence

The soil is rich in organic carbon, a strong base for farming and restoration.

Carbon-rich soil holds water and nutrients well, supports higher yields and faster regrowth, and may qualify for soil-carbon programs.

75.1 g/kg soil organic carbon in the top 30 cm, clay loam texture, pH 5.3 (ISRIC SoilGrids).

Terrainhigh confidence

The land is gently rolling.

Gentle terrain is generally workable with only minor grading for buildings or roads.

Mean elevation 1,090 m, mean slope 7°, 37 m of relief.

Biodiversitylow confidence

Little wildlife has been formally recorded here.

A low record count usually reflects limited survey effort rather than low biodiversity, so a ground survey is needed before drawing conclusions.

Only 0 biodiversity records nearby (GBIF).

Accesshigh confidence

The parcel is relatively remote.

Distance from roads and towns means lower encroachment pressure and more privacy, but higher transport and operating costs.

About 1.6 km to the nearest road.

Confidence reflects the data behind each reading: high when clear passes or strong sources agree, medium on a partial or single-source signal, low where the data is sparse or indirect. A low-confidence reading usually needs one more clear pass, or a check on the ground.

What the land is telling us

Read across the record, the land reads as stable to regenerating: the core cover and water signals are holding, which means the work is to build on a sound base rather than to reverse a decline.

Of the land's core processes, community dynamics are barely recorded here — an absence of data, not necessarily of life. What orbit cannot see is what happens below the surface — soil biology, structure, and the carbon held in the ground — so treat those as the first things to confirm underfoot.

Taken together, this is workable land whose plan must come before the capital. Its clearest strength to build from is that the soil is rich in organic carbon, a strong base for farming and restoration.

Where the capital goes · corridor & deployment

72Conservation priority
CorridorRestoration gap

Inside the corridor network, with restoration upside.

inside the network, with restoration upside

Within the Corredor Biológico Montes del Aguacate (screening) · Área de Conservación Pacífico Central (ACOPAC)

Inside the Corredor Biológico Montes del Aguacate, this reads as a break in the corridor to close, scoring 72 out of 100 for conservation priority. It sits in the corridor network, where capital spent on restoration compounds into connectivity. A small, low-footprint operation (fit 58/100) could fund the work from the already-worked ground.

58/100
Hospitality fit

The funding layer: a small, low-footprint operation sited on the already-worked ground, sized to carry the restoration — never spending the habitat it depends on.

Corridormedium confidence

The parcel falls within the Corredor Biológico Montes del Aguacate (screening).

This is a declared biological corridor in Área de Conservación Pacífico Central (ACOPAC) — land inside it carries a national connectivity mandate and is where conservation capital compounds, joining protected areas rather than standing alone. The corridor links Cordillera Volcánica Central, Cerros de Turrubares, Pacífico Central.

Centroid inside the PNCB screening extent for this corridor. Extent is approximate — confirm the parcel against the official SINAC/PNCB record.

Conservationmedium confidence

This reads as a gap in the corridor — restoring cover here closes a break in connectivity.

A cleared or thin stretch inside the network is the highest-leverage place to restore: replanting or assisted regeneration here reconnects habitat that is otherwise cut, which a stand of forest outside the corridor cannot do.

18% tree cover.

Hospitalitylow confidence

A modest hospitality layer is possible, but it is not the strongest card.

In the regenerative model the lodging is a means, not the end: a low-footprint operation sited on the already-worked ground earns the revenue that funds the restoration and stewardship, while the core is left to recover. Kept small, it also gives the corridor local guardians with a reason to hold it.

Hospitality fit 58/100, drawing on protected land alongside. Site any building on the disturbed matrix, not the habitat.

Capital moves

  1. 01

    Tie up the land before restoring it — purchase or an easement that holds through a sale.

    Before committing

    Restoration is a multi-year investment; without secure tenure the connectivity it builds can be undone by the next owner.

    Confirm on the ground · Trace the title with a local lawyer and pull the cadastral record; check FONAFIFO PSA eligibility (reforestation or regeneration) for the parcel.

  2. 02

    Close the gap: replant the cleared ground and let the neighbouring forest seed back in.

    First year

    This parcel is where the corridor is broken, so restoring cover here reconnects habitat — the single highest-leverage ecological move on the land.

    Confirm on the ground · Walk the parcel with a restoration ecologist to map what to plant and where natural regeneration will do the work on its own; confirm the seed sources in the adjacent forest.

  3. 03

    Site a small, low-footprint hospitality operation on the already-worked ground to fund the stewardship.

    Once the land is secured

    A modest operation on the disturbed matrix earns the revenue that pays for the restoration and the guardians, without spending the habitat it depends on.

    Confirm on the ground · Model the operation at a size the land can carry, keep it off the habitat, and check the Certificado de Sostenibilidad Turística (CST) and local zoning before designing anything.

  4. 04

    Set a connectivity baseline and re-read it — camera traps and the species the corridor was declared for.

    Ongoing

    Funders and partners judge a corridor by whether wildlife actually moves through it; a repeatable baseline is what turns the thesis into evidence and steers the next round of capital.

    Confirm on the ground · Run camera traps and species counts on a fixed schedule — track the indicator species named for this corridor (A piedmont corridor tying the central volcanic range to the Pacific slope across the Aguacate hills).

The deployment reading is a screening lens layered on the Land Score — it points capital at the land where it builds the most connectivity, and each move is paired with the ground-truth step that confirms it. Corridor extents are approximate PNCB screening footprints; confirm a parcel against the official SINAC/PNCB record.

Best-fit regenerative model

Corridor anchor reserve

36/100 fit

Protect the keystone; hold the connection open.

With 18% tree cover inside a declared biological corridor and a conservation priority of 72, the leverage here is protection: secure the core so the connection it anchors stays open.

High-value habitat inside the connectivity network. The move is to secure it — purchase or easement — so the corridor it anchors stays unbroken.

1,090 m elevation18% forest7.2° slopeinside a corridor

Also consider · Ecolodge / retreat (32) · Restoration frontier (31)

A published, rules-based suggestion read from the parcel's own indicators — forest, water, slope, access, and its place in the network. It names the shape of project the land is already set up to carry; confirm it against tenure, soils, and what you know from the ground.

What to do

  1. 01

    Carry out a field biodiversity survey to see what the records miss.

    First year

    A thin record here usually reflects little survey effort, not little life; what actually lives on the parcel shapes both its value and its constraints.

    Confirm on the ground · Have an ecologist survey across seasons; local naturalists and birders often already know the site.

  2. 02

    Confirm tenure and boundaries against the legal record before relying on this reading.

    Before committing

    The satellite record cannot see title, easements, or where the legal boundary actually runs — the things that govern what you can do here.

    Confirm on the ground · Pull the title and cadastral record, and walk the boundary against it on the ground.

  3. 03

    Confirm soil and water on the ground, then design to what the land can carry.

    First visit

    The land is workable, but the plan has to be built to its limits rather than around a hoped-for use.

    Confirm on the ground · Ground-truth the key constraints before committing to a use, then size the plan to them.

Questions to sit with

  • The soil is a real asset here — what use would build it further rather than spend it down?
  • Are you here to hold this land as it is, to work it, or to help it change — and does the reading above serve that intention?
  • If the work succeeds, what do the water, the canopy, and the people around this land look like a generation from now — and what is the first condition that has to change for that to begin?
  • Where does this reading disagree with what you have seen walking the land? That disagreement is the first thing to check on the ground.

These are not data gaps — they are the questions the data cannot answer.

Reading the land's record…

Climate · to 2050

Source unavailable for this parcel.

Water

mm/yr
Rainfall
%
20-yr trend
1.4km
To watercourse

Río Barranca · Río La Paz · Río Espino · Río San Luis

Soil · 0–30 cm

75.1g/kg
Org. carbon
5.3
pH
35%
Sand
36%
Clay

Clay loam

Terrain & cover

1,090m
Elevation
7.2°
Mean slope
18%
Forest
0%
Built
Grassland 82%Tree cover 18%

Ecology

0
Recorded wildlife observations
GBIF

Pressure

1.6km
To road
km
To settlement

Forest history · since 2000

38%
Tree cover 2000
3.7%
Cover lost
2010
Latest loss

Hansen Global Forest Change GFC-2023-v1.11

Costa Rica ecological corridor

Within
Corridor
screening extent
Área de Conservación Pacífico Central (ACOPAC)
Conservation area

Corredor Biológico Montes del Aguacate

A piedmont corridor tying the central volcanic range to the Pacific slope across the Aguacate hills.

Connects · Cordillera Volcánica Central · Cerros de Turrubares · Pacífico Central

PNCB / SINAC — Corredores Biológicos (screening reference) · approximate screening extent — confirm against the official SINAC / PNCB record

See the corridor network →

Talk it through with Gregorio

This reading is built from satellite and open data. It cannot see soil biology, legal tenure, or what you already know from walking the land — a 30-minute call tests the reading against the ground and sequences the work. No cost, no obligation.

Sources & method · 8 layers
Water, roads & protected areas — OpenStreetMap

Overpass (waterways, highways, places, protected areas)

vector · live
ODbL 1.0
Biodiversity — GBIF

Occurrence records (count + top species)

point · live
Mixed CC0 / CC-BY / CC-BY-NC (per dataset)
Place — OpenStreetMap / Nominatim

Nominatim reverse geocode

settlement · live
ODbL 1.0
Terrain — AWS Terrarium (Mapzen)

Terrarium elevation tiles

~10 m (z12) · 2017
Open (attribution)
Soil — ISRIC SoilGrids v2

SoilGrids v2.0 (SOC, pH, sand, clay; 0–30 cm)

250 m · 2020
CC-BY 4.0
Land cover — ESA WorldCover

WorldCover 2021 v200

10 m · 2021
CC-BY 4.0 (commercial promotion: notify due@esa.int)
Surface water — JRC Global Surface Water

Global Surface Water v1.4 — occurrence & seasonality

30 m · 1984–2021
Copernicus / open (attribution)
Forest loss — Hansen Global Forest Change

Global Forest Change (tree cover 2000 + annual loss)

~30 m · 2000–2023
CC-BY 4.0

Every number above is public, open data — named, dated, and licensed. What TERRA does not publish is the lens: the weights, curves, and verdict thresholds that turn these layers into a Land Score. That judgment is calibrated from land walked on the ground, and it stays proprietary.

Unavailable for this parcel: sentinel2_ndvi, sentinel1_rtc, open_meteo_climate, worldbank_wgi, landsat_lst — the affected pillars were reweighted, not guessed.

Generated Wed, 01 Jul 2026 22:30:43 GMT · 12.1s · synthesized by TERRA.

Generated Wed, 01 Jul 2026 22:30:43 GMT · synthesized by TERRA · Dear Wise Earth.

Report — Ángeles, San Ramón, Alajuela Province · TERRA