Public reading

San Isidro de El General, Pérez Zeledón, San Jose Province

Shaded-relief view of the terrain around San Isidro de El General, Pérez Zeledón, San Jose Province, the parcel boundary drawn in gold
500 m
Shaded relief · AWS Terrain Tiles
37Land Score

Workable land — the plan must come before the capital.

San Isidro de El General, Pérez Zeledón, San Jose Province

Five readings

The parcel from orbit

Finding the latest clear satellite pass…

Reading the place

This 44-hectare parcel near San Isidro de El General, Pérez Zeledón, San Jose Province is workable land whose plan must come before the capital, scoring 37 out of 100. The reading that most shapes the work here is that rainfall has been declining over the past two decades. Its main strength is that a watercourse runs through the parcel. The first move: build a water budget sized to the projected dry spell, not the annual average.

Riskmedium confidence

Rainfall has been declining over the past two decades.

Water planning should target the drier conditions ahead, not today's averages; storage and drought-tolerant choices matter more here.

Annual rainfall is down about 31% over 20 years (linear trend, 2004–2024).

Opportunityhigh confidence

A watercourse runs through the parcel.

On-site water supports irrigation, livestock, and habitat and can lower water-supply costs — though it may carry buffer or setback rules worth checking.

A mapped river or stream crosses the parcel (Río General).

Climatemedium confidence

Models project a warmer and drier climate here by 2050.

Expect a warmer and drier future here; favour species and infrastructure that tolerate the projected range.

Projected change by 2050: +1.2 °C mean temperature, -4.4% rainfall. Exposure rated Moderate.

Waterhigh confidence

Rainfall is very high.

Abundant water supports productive growth but raises the risk of flooding, waterlogging, and nutrient leaching, so drainage and slope matter.

6,847 mm of rain per year. A watercourse crosses the parcel.

Terrainhigh confidence

The land is gently rolling.

Gentle terrain is generally workable with only minor grading for buildings or roads.

Mean elevation 721 m, mean slope 4°, 28 m of relief.

Biodiversitymedium confidence

Biodiversity records are moderate.

There is a reasonable but incomplete picture of local wildlife; a ground survey would sharpen any conservation or regulatory assessment.

52 biodiversity records nearby, including Smilisca phaeota and Chloroceryle amazona (GBIF).

Soilmedium confidence

Soil organic carbon is moderate.

The soil is workable but will benefit from cover cropping and organic inputs to build fertility before intensive use.

29.8 g/kg soil organic carbon in the top 30 cm, clay loam texture, pH 5.5 (ISRIC SoilGrids).

Accesshigh confidence

Road and town access are close.

Good access lowers development and logistics costs but can raise encroachment pressure and land prices.

About 0.71 km to the nearest road, 2.63 km to San Isidro de El General.

Confidence reflects the data behind each reading: high when clear passes or strong sources agree, medium on a partial or single-source signal, low where the data is sparse or indirect. A low-confidence reading usually needs one more clear pass, or a check on the ground.

What the land is telling us

The land reads as holding rather than actively regenerating: the standing cover is intact, but the water or vegetation signal is under strain, so the trajectory turns on how the coming dry years are managed.

Of the land's core processes, the water cycle reads as adequate to abundant, so the question is less supply than how well the land captures and holds what falls. What orbit cannot see is what happens below the surface — soil biology, structure, and the carbon held in the ground — so treat those as the first things to confirm underfoot.

Taken together, this is workable land whose plan must come before the capital. Its clearest strength to build from is that a watercourse runs through the parcel.

Where the capital goes · corridor & deployment

84Conservation priority
CorridorRestoration gap

Inside the corridor network, with restoration upside.

inside the network, with restoration upside

Within the Corredor Biológico Alexander Skutch (screening) · Área de Conservación La Amistad-Pacífico (ACLAP)

Inside the Corredor Biológico Alexander Skutch, this reads as a break in the corridor to close, scoring 84 out of 100 for conservation priority. It sits in the corridor network, where capital spent on restoration compounds into connectivity. A small, low-footprint operation (fit 69/100) could fund the work from the already-worked ground.

69/100
Hospitality fit

The funding layer: a small, low-footprint operation sited on the already-worked ground, sized to carry the restoration — never spending the habitat it depends on.

Corridormedium confidence

The parcel falls within the Corredor Biológico Alexander Skutch (screening).

This is a declared biological corridor in Área de Conservación La Amistad-Pacífico (ACLAP) — land inside it carries a national connectivity mandate and is where conservation capital compounds, joining protected areas rather than standing alone. The corridor links Reserva Los Cusingos, Cordillera de Talamanca, Río General.

Centroid inside the PNCB screening extent for this corridor. Extent is approximate — confirm the parcel against the official SINAC/PNCB record.

Conservationmedium confidence

This reads as a gap in the corridor — restoring cover here closes a break in connectivity.

A cleared or thin stretch inside the network is the highest-leverage place to restore: replanting or assisted regeneration here reconnects habitat that is otherwise cut, which a stand of forest outside the corridor cannot do.

20% tree cover.

Hospitalitymedium confidence

A small hospitality operation could carry the conservation here.

In the regenerative model the lodging is a means, not the end: a low-footprint operation sited on the already-worked ground earns the revenue that funds the restoration and stewardship, while the core is left to recover. Kept small, it also gives the corridor local guardians with a reason to hold it.

Hospitality fit 69/100, drawing on protected land alongside, water on site. Site any building on the disturbed matrix, not the habitat.

Capital moves

  1. 01

    Tie up the land before restoring it — purchase or an easement that holds through a sale.

    Before committing

    Restoration is a multi-year investment; without secure tenure the connectivity it builds can be undone by the next owner.

    Confirm on the ground · Trace the title with a local lawyer and pull the cadastral record; check FONAFIFO PSA eligibility (reforestation or regeneration) for the parcel.

  2. 02

    Close the gap: replant the cleared ground and let the neighbouring forest seed back in.

    First year

    This parcel is where the corridor is broken, so restoring cover here reconnects habitat — the single highest-leverage ecological move on the land.

    Confirm on the ground · Walk the parcel with a restoration ecologist to map what to plant and where natural regeneration will do the work on its own; confirm the seed sources in the adjacent forest.

  3. 03

    Site a small, low-footprint hospitality operation on the already-worked ground to fund the stewardship.

    Once the land is secured

    A modest operation on the disturbed matrix earns the revenue that pays for the restoration and the guardians, without spending the habitat it depends on.

    Confirm on the ground · Model the operation at a size the land can carry, keep it off the habitat, and check the Certificado de Sostenibilidad Turística (CST) and local zoning before designing anything.

  4. 04

    Set a connectivity baseline and re-read it — camera traps and the species the corridor was declared for.

    Ongoing

    Funders and partners judge a corridor by whether wildlife actually moves through it; a repeatable baseline is what turns the thesis into evidence and steers the next round of capital.

    Confirm on the ground · Run camera traps and species counts on a fixed schedule — track the indicator species named for this corridor (A General-valley corridor around the naturalist's Los Cusingos reserve, reconnecting Talamanca's foothills to the river).

The deployment reading is a screening lens layered on the Land Score — it points capital at the land where it builds the most connectivity, and each move is paired with the ground-truth step that confirms it. Corridor extents are approximate PNCB screening footprints; confirm a parcel against the official SINAC/PNCB record.

Best-fit regenerative model

Watershed protection

50/100 fit

Hold the water tower for everyone downstream.

Steep (3.7°), wet (6,847 mm/yr), and river-laced, this parcel's highest value is the water and soil it keeps in place for everyone downstream.

Steep, wet, river-laced ground whose highest value is the water and soil it keeps in place. Protect and reforest the slopes; the beneficiaries are downstream.

721 m elevation20% forest3.7° slope6,847 mm rain/yrinside a corridor

Also consider · Ecolodge / retreat (46) · Corridor anchor reserve (44)

A published, rules-based suggestion read from the parcel's own indicators — forest, water, slope, access, and its place in the network. It names the shape of project the land is already set up to carry; confirm it against tenure, soils, and what you know from the ground.

What to do

  1. 01

    Build a water budget sized to the projected dry spell, not the annual average.

    First dry season

    Water, not the yearly total, is the limiting factor here; storage and drought-tolerant choices decide what the land can carry.

    Confirm on the ground · Measure the springs, wells, and watercourses at the end of the dry season, when supply is at its lowest — that is the number to plan against.

  2. 02

    Confirm tenure and boundaries against the legal record before relying on this reading.

    Before committing

    The satellite record cannot see title, easements, or where the legal boundary actually runs — the things that govern what you can do here.

    Confirm on the ground · Pull the title and cadastral record, and walk the boundary against it on the ground.

  3. 03

    Confirm soil and water on the ground, then design to what the land can carry.

    First visit

    The land is workable, but the plan has to be built to its limits rather than around a hoped-for use.

    Confirm on the ground · Ground-truth the key constraints before committing to a use, then size the plan to them.

Questions to sit with

  • At the end of the dry season, where does water still hold on this land — and what would keep it there a month longer?
  • Are you here to hold this land as it is, to work it, or to help it change — and does the reading above serve that intention?
  • If the work succeeds, what do the water, the canopy, and the people around this land look like a generation from now — and what is the first condition that has to change for that to begin?
  • Where does this reading disagree with what you have seen walking the land? That disagreement is the first thing to check on the ground.

These are not data gaps — they are the questions the data cannot answer.

Reading the land's record…

How it compares

9thpercentile · Subtropical · Neotropic

Ranked against 29 readings · same thermal belt

Reads below most of the 29 readings logged in Subtropical · Neotropic — stronger than 9%. Climate resilience is its strongest signal here (56th percentile), ecology its weakest (2nd). Rainfall is declining across the landscape to the south-east.

Percentile by reading · higher is better land

Water
19th
Soil
25th
Ecology
2nd
Climate
56th
Low pressure
38th

Landscape · 11 readings within 44 km

  • ·Rainfall is declining across the landscape to the south-east
  • ·Land reads stronger toward the south-west

Percentiles compare this reading against the growing corpus of public TERRA readings in like land — not all land on Earth. They sharpen as the wall grows.

Climate · to 2050

21.2°C
Mean temp
+1.2°C
2050 Δ temp
-4%
2050 Δ rain

Exposure · Moderate

2050 sits within a single planning horizon — about 24 years out. The models expect seasons here about 1.2°C warmerthan today's, with 4% less rain. Expect is the honest verb: this is the middle of a range of futures, not a certainty — so design to the range, not to today.

Water

6,847mm/yr
Rainfall
-31.4%
20-yr trend
On site
To watercourse

Río General · Río Pedregoso · Quebrada Junco · Río Pacuar

Soil · 0–30 cm

29.8g/kg
Org. carbon
5.5
pH
31%
Sand
36%
Clay

Clay loam

Terrain & cover

721m
Elevation
3.7°
Mean slope
20%
Forest
7%
Built
Grassland 73%Tree cover 20%Built-up 7%

Ecology

52
Recorded wildlife observations
GBIF

Smilisca phaeota · Chloroceryle amazona · Phaeochroa cuvierii · Heliomaster longirostris

Pressure

0.7km
To road
2.6km
To settlement
San Isidro de El General

Costa Rica ecological corridor

Within
Corridor
screening extent
Área de Conservación La Amistad-Pacífico (ACLAP)
Conservation area

Corredor Biológico Alexander Skutch

A General-valley corridor around the naturalist's Los Cusingos reserve, reconnecting Talamanca's foothills to the river.

Connects · Reserva Los Cusingos · Cordillera de Talamanca · Río General

PNCB / SINAC — Corredores Biológicos (screening reference) · approximate screening extent — confirm against the official SINAC / PNCB record

See the corridor network →

Talk it through with Gregorio

This reading is built from satellite and open data. It cannot see soil biology, legal tenure, or what you already know from walking the land — a 30-minute call tests the reading against the ground and sequences the work. No cost, no obligation.

Sources & method · 8 layers
Place — OpenStreetMap / Nominatim

Nominatim reverse geocode

settlement · live
ODbL 1.0
Terrain — AWS Terrarium (Mapzen)

Terrarium elevation tiles

~10 m (z12) · 2017
Open (attribution)
Climate — Open-Meteo

Archive 2004–2024 + MPI-ESM1-2-XR to 2050

~9 km · 2004–2024 / 2045–2049
CC-BY 4.0 (data); non-commercial API tier
Soil — ISRIC SoilGrids v2

SoilGrids v2.0 (SOC, pH, sand, clay; 0–30 cm)

250 m · 2020
CC-BY 4.0
Land cover — ESA WorldCover

WorldCover 2021 v200

10 m · 2021
CC-BY 4.0 (commercial promotion: notify due@esa.int)
Water, roads & protected areas — OpenStreetMap

Overpass (waterways, highways, places, protected areas)

vector · live
ODbL 1.0
Biodiversity — GBIF

Occurrence records (count + top species)

point · live
Mixed CC0 / CC-BY / CC-BY-NC (per dataset)
Surface water — JRC Global Surface Water

Global Surface Water v1.4 — occurrence & seasonality

30 m · 1984–2021
Copernicus / open (attribution)

Every number above is public, open data — named, dated, and licensed. What TERRA does not publish is the lens: the weights, curves, and verdict thresholds that turn these layers into a Land Score. That judgment is calibrated from land walked on the ground, and it stays proprietary.

Generated Tue, 23 Jun 2026 22:35:10 GMT · 5.5s · synthesized by TERRA.

Location context