Skip to the content
TERRAby Dear Wise EarthOpen beta
Your portfolioUpdatesSign inES

Your portfolio/Sayan, Bali

On the land

Sayan, Bali

51 · Partly converted

The land from above

Water and ground

Forest and life

Climate and air

Place, rules and fit

Going deeper

Watch

Overview

← Your portfolio

Indonesia · 46 ha

Sayan, Bali

Partly converted · Regenerate

Partly converted. The work is regeneration.

51of 100range 35 to 67 · 59% sure

Condition of the land

The score, 0 to 100. 100 is land of its kind that people have left alone.

487896

51 reads partly converted (48 to 77). The range, 35 to 67, is where its two measures disagree; 59% of it stays partly converted. A site visit settles it.

This is working land, far from what it once was. Decide what it is for before money goes in.

Read from two measures

Unchanged44

How little people have changed it, from roads and buildings to fields and lights.

Unconverted58

How much of it is not fields, buildings, or missing the forest it would carry.

The score sits between the two.

Trees now 58%. Left alone, about 82%.

Read from orbit and public records, as a reason to go and look. It is not a certificate, an appraisal or a ruling on this land or the people who work it.

If you know this land and the reading gets it wrong, tell us.

The land's signature

Five pillars under the score, 0 at the centre to 100 at the rim: water, ecology, climate resilience, freedom from pressure and soil.

51Water100Ecology48Climate61Pressure8Soil53

Floor, 40Short of the floorTree cover, 58%

The dashed amber circle is the fair floor, 40; red is the shortfall below it.

Hazard screen

High 3 · Medium 5 · Low or very low 1 · Inland 2

Urban floodhigh
Volcanohigh
Wildfirehigh
River floodmedium
Earthquakemedium
Cyclonemedium
Water scarcitymedium
Extreme heatmedium
Landslidelow
Coastal floodinland
Tsunamiinland

Screened for Bali, Indonesia, not for this land: a planning prompt. A site study settles the land itself. The sea is 14 km away, so the coastal rows do not apply to this land.

StrengthA watercourse runs through the parcel. A mapped river or stream crosses the parcel (Tukad Bengbeng).
RiskForest on this land has been cleared, most recently in 2023. 57% of it was moist forest that has been cleared and has not grown back, last in 2023 (JRC Tropical Moist Forest).
UnknownJurisdiction is part of the parcel. Indonesia · Bali · Ubud.
First moveEngage local counsel to confirm title and permitting before you commit capital.

From each chapter

One finding from each part of the reading. Tap a line to open its chapter.

Listen

 

From here

TERRA Watch tells you when this land changes. The report puts the reading on paper.

Verified from orbit · 23 Oct 2026 · 31 of 35 sources

Signed 23 Oct 2026 · sha256 02205450…818cc8