Skip to the content
TERRAby Dear Wise Earth
Your portfolioUpdatesSign inES

Your portfolio/Jagraon Tahsil, Punjab

On the land

Jagraon Tahsil, Punjab

27 · Reclaim

The land from above

Water and ground

Forest and life

Climate and air

Place, rules and fit

Going deeper

Watch

Overview

← Your portfolio

India · 100 ha

Jagraon Tahsil, Punjab

Reclaim

Foundational work first. The potential follows.

27of 100

Condition of the land

Reclaim77% sure

This land has lost most of what it was. Bringing it back is slow.

18of 100, conditionrange 0 to 39

Trees now 1%. Left alone, about 39%.

Unchanged35
Unconverted1

100 is land people have left alone. Fields, buildings, roads and missing trees where forest belongs pull it down.

The range crosses two verdicts. A walk on the ground settles it.

Water45
Ecology1
Climate31
Pressure38
Soil21

The tick on each bar is the fair floor, 40; red falls short of it. The mark draws the same five as petals.

StrengthThe land is projected to see roughly 205 hot days a year by 2050. About 205 days a year with a daily high of 32 °C or more by the 2050 horizon up from about 170 today (today's daily highs from Open-Meteo, moved by the World Bank climate models).
RiskRainfall is low, making water availability a primary constraint. 655 mm of rain per year — below the roughly 1,000 mm rain-fed agriculture usually needs.
UnknownLittle wildlife has been formally recorded on the parcel itself. Only 1 biodiversity records inside the boundary.
First moveBuild a water budget sized to the projected dry spell, not the annual average.
Rain655mm a year
Elevation229m
Tree cover0.8%
Climate 2050+1.9°C
Records of life1GBIF
Area100ha

Verified from orbit · 16 Oct 2026 · 29 of 31 sources

Signed 16 Oct 2026 · sha256 890a7ed7…94e027