Public reading632.9 ha · 27.30 N 112.89 W

Municipio de Mulegé, Baja California Sur

25Reclaim
Shaded-relief view of the land around Municipio de Mulegé, Baja California Sur, Mexico, the parcel boundary drawn in gold633 ha inside the gold line
2 km
Shaded relief · AWS Terrain Tiles
25out of 100 · Land ScoreReclaim

Foundational work first. The potential follows.

4th percentile for like land · Frontier tier · 27 conservation priority

8 of 8 sources answered, each named and dated ↓ · higher is better on every pillar; pressure reads calm

The land at a glance

WATER24ECOLOGY38CLIMATE10PRESSURE40SOIL1825
floor fair, 40shortfall below the floorring the ground's cover

Three things to know

  • Strength

    A watercourse runs through the parcel.

    A mapped river or stream crosses the parcel (Arroyo San Ignacio).

    clear sky

  • Risk

    Rainfall is low, making water availability a primary constraint.

    120 mm of rain per year — below the roughly 1,000 mm rain-fed agriculture usually needs.

    clear sky

    Measure it on the land →

First move · first dry season

Build a water budget sized to the projected dry spell, not the annual average.

Measure the springs, wells, and watercourses at the end of the dry season, when supply is at its lowest — that is the number to plan against.

then: Design to the 2050 climate projections rather than today's conditions.

Request TERRA GroundThe canopy, the soil and the water, measured on the land and kept current.

Every view, at a glance

Open one to read it in full

What next

Check this reading on the land itself.

The canopy, the soil and the water are read from orbit. TERRA Ground measures them on the land and keeps the reading current.

The record of this land

Read once, 23 Jun 2026. Each new reading of this land is kept here, so it shows how the land moves.

← Explore the map