Palmichal, Acosta
The capacity is present; the work is regeneration.
35th percentile for like land · Frontier tier · 47 conservation priority
9 of 13 sources answered, each named and dated ↓ · higher is better on every pillar; pressure reads calm · silent: sentinel2_ndvi, sentinel1_rtc, worldbank_wgi…
The land at a glance
Three things to know
- Strength
A watercourse runs through the parcel.
A mapped river or stream crosses the parcel (Río Negro).
clear sky
- Risk
This area is highly exposed to projected climate change by 2050.
Projected change by 2050: +1.2 °C mean temperature, +22% rainfall.
light haze
Measure it on the land → - Unknown
Most of the parcel reads as tree cover.
68% of the parcel reads as tree cover (satellite land-cover mapping).
in fog
Settle it on the ground →
First move · first year
Design to the 2050 climate projections rather than today's conditions.
Cross-check the projections against the memory of long-time residents on how the seasons have already shifted here.
then: Ground-truth what the canopy actually is before assuming forest value.
Every view, at a glance
Open one to read it in full
What next
Check this reading on the land itself.
The canopy, the soil and the water are read from orbit. TERRA Ground measures them on the land and keeps the reading current.
The record of this land
Read once, 3 Jul 2026. Each new reading of this land is kept here, so it shows how the land moves.
← Explore the map