This 36,062-hectare parcel near Puerto Jiménez, Puntarenas Province, 61301 is land with sound foundations and clear regenerative upside, scoring 58 out of 100. The reading that most shapes the work here is that the rainfall archive shows an unusually steep drying signal — verify before relying on it. Its main strength is that most of the parcel reads as tree cover. The first move: build a water budget sized to the projected dry spell, not the annual average.
Risklow confidence
The rainfall archive shows an unusually steep drying signal — verify before relying on it.
A swing this large more often reflects a data artifact or measurement change than real climate; water planning should wait on local records rather than build on this number.
The archive's linear trend reads about 31% lower over 20 years (2004–2024) — outside the range the engine treats as dependable.
Riskhigh confidence
The terrain is steep, which constrains construction and raises erosion risk.
Steep slopes increase building and road costs, limit machinery access, and make the land more prone to erosion and landslides.
Mean slope 3°, with 651 m of elevation change across the parcel.
Riskmedium confidence
This area is highly exposed to projected climate change by 2050.
Large shifts in temperature and rainfall can change what the land can support, so any plan should be built around the projected conditions, not current ones.
Projected change by 2050: +1.3 °C mean temperature, +43% rainfall. Exposure rated High.
Riskhigh confidence
This ground has a recorded seismic history.
Repeated strong earthquakes within reach shape how anything here should be built — seismic design codes, slope stability under shaking, and insurance all follow from it.
113 earthquakes ≥ M5 within 100 km in 50 years, strongest M7.1, most recent M5.1 in 2025 (USGS catalog).
Opportunitylow confidence
Most of the parcel reads as tree cover.
Tree cover can carry real conservation and carbon value, but satellite land-cover cannot tell natural forest from a monoculture plantation (oil palm, rubber, teak). Confirm which it is before assuming biodiversity or carbon value.
93% of the parcel reads as tree cover (satellite land-cover mapping). Naturalness is not verified.
Opportunityhigh confidence
A watercourse runs through the parcel.
On-site water supports irrigation, livestock, and habitat and can lower water-supply costs — though it may carry buffer or setback rules worth checking.
A mapped river or stream crosses the parcel (Rio Claro).
Waterhigh confidence
Rainfall is very high.
Abundant water supports productive growth but raises the risk of flooding, waterlogging, and nutrient leaching, so drainage and slope matter.
4,618 mm of rain per year. A watercourse crosses the parcel.
Watermedium confidence
This parcel is a position in a watershed, not an island.
What arrives here is decided upstream, and what happens here is felt downstream — land use on this parcel is water stewardship for everyone below it. Read the upstream land uses before trusting the water, and count the downstream neighbours before changing it.
its own water runs 3.3 km downstream of it (MERIT-Hydro screening hydrography).
Biodiversityhigh confidence
The area has a rich record of documented wildlife.
High biodiversity adds conservation value, may bring species-protection rules, and can support eco-tourism or habitat-credit programs. A count this size also reflects heavy survey effort — this is a well-watched landscape, so read it as well-documented rather than proportionally richer than its quieter neighbours.
337,015 biodiversity records nearby, including Ara macao and Ramphastos ambiguus (GBIF, the global species-record archive).
Soilmedium confidence
Soil organic carbon is moderate.
The soil is workable but will benefit from cover cropping and organic inputs to build fertility before intensive use.
29 g/kg soil organic carbon in the top 30 cm, clay loam texture, pH 5.3 (ISRIC SoilGrids).
Accesshigh confidence
The parcel is relatively remote.
Distance from roads and towns means lower encroachment pressure and more privacy, but higher transport and operating costs.
About 4.83 km to the nearest road, 11.38 km to Puerto Jiménez.
Accessmedium confidence
The human fabric around this land is measured, not assumed.
Labour, emergencies, schooling, and electricity all run on these distances — they decide what daily life and operations here actually cost.
11,282 people live within 5 km (WorldPop 2020); nearest hospital or clinic 11.3 km (Ebais Cañaza); school 4.9 km; airstrip 8.4 km.
Accesslow confidence
Jurisdiction is part of the parcel.
Permits, zoning, water, and roads run through these offices — knowing who governs the land is the first step of every plan that touches it.
Costa Rica · Puntarenas · Puerto Jiménez — canton HDI 0.74 (2022, PNUD/UCR), 8,789 people in the governing unit.
Accessmedium confidence
Official Costa Rican record places this in Puerto Jiménez, Puerto Jiménez, Puntarenas.
National cadastral and administrative data ground the parcel in the legal record — the basis for title, permitting, and tax diligence.
Jurisdiction: Puerto Jiménez, Puerto Jiménez, Puntarenas. Source: SNIT.