Rivas, Pérez Zeledón
Real upside, waiting on the work.
35th percentile for like land · Keystone tier · 100 conservation priority
9 of 12 sources answered, each named and dated ↓ · higher is better on every pillar; pressure reads calm · silent: sentinel2_ndvi, sentinel1_rtc, landsat_lst
The land at a glance
Three things to know
- Strength
A watercourse runs through the parcel.
A mapped river or stream crosses the parcel (Río Buenavista).
clear sky
- Risk
The terrain is steep, which constrains construction and raises erosion risk.
Mean slope 14°, with 358 m of elevation change across the parcel.
clear sky
Measure it on the land → - Unknown
Most of the parcel reads as tree cover.
84% of the parcel reads as tree cover (satellite land-cover mapping).
in fog
Settle it on the ground →
First move · before committing
Design roads and structures to the contour, and get a geotechnical and erosion assessment before any earthworks.
Have a geotechnical engineer assess slope stability and cut-and-fill on the ground before a road line is committed.
then: Design to the 2050 climate projections rather than today's conditions.
Every view, at a glance
Open one to read it in full
What next
Check this reading on the land itself.
The canopy, the soil and the water are read from orbit. TERRA Ground measures them on the land and keeps the reading current.
The record of this land
Read once, 27 Jun 2026. Each new reading of this land is kept here, so it shows how the land moves.
← Explore the map