Tepoztlán, Morelos
A plan would change this land's answer.
8th percentile for like land · Frontier tier · 15 conservation priority
14 of 21 sources answered, each named and dated ↓ · higher is better on every pillar; pressure reads calm · silent: osm_overpass, sentinel2_ndvi, sentinel1_rtc…
The land at a glance
Three things to know
- Strength
Rainfall is moderate, and it falls in one season.
1,502 mm of rain per year (CHIRPS, 2004 to 2024).
clear sky
- Risk
Dry spells are projected to run about 50 days by 2050.
Longest yearly run of days under 1 mm of rain projected near 50 days (today's run from the CHIRPS rain record, the change from the climate models).
light haze
Measure it on the land → - Unknown
Little wildlife has been formally recorded on the parcel itself.
No biodiversity records inside the boundary (GBIF, the global species-record archive).
in fog
Settle it on the ground →
First move · first dry season
Build a water budget sized to the projected dry spell, not the annual average.
Measure the springs, wells, and watercourses at the end of the dry season, when supply is at its lowest — that is the number to plan against.
then: Design to the 2050 climate projections rather than today's conditions.
Every view, at a glance
Open one to read it in full
What next
Check this reading on the land itself.
The canopy, the soil and the water are read from orbit. TERRA Ground measures them on the land and keeps the reading current.
The record of this land
Read once, 27 Aug 2026. Each new reading of this land is kept here, so it shows how the land moves.
← Explore the map