This 19-hectare parcel near Bönigen, Interlaken-Oberhasli administrative district, Oberland administrative region is land with sound foundations and clear regenerative upside, scoring 63 out of 100. The reading that most shapes the work here is that this area is highly exposed to projected climate change by 2050. Its main strength is that the soil is rich in organic carbon, a strong base for farming and restoration. The first move: design to the 2050 climate projections rather than today's conditions.
Riskmedium confidence
This area is highly exposed to projected climate change by 2050.
Large shifts in temperature and rainfall can change what the land can support, so any plan should be built around the projected conditions, not current ones.
Projected change by 2050: +1.2 °C mean temperature, -15% rainfall. Exposure rated High.
Riskmedium confidence
Recorded heritage features stand within 2 km of this parcel.
A heritage-bearing landscape raises the likelihood that development here triggers archaeological assessment, and that finds during works must stop them. That is a planning fact, not a burden — and locations are deliberately not shown.
36 recorded features within 10 km, nearest under 2 km. Recorded presence in the open public record only. Absence of information here is not evidence of absence — national heritage registries are the authority.
Opportunitymedium confidence
The soil is rich in organic carbon, a strong base for farming and restoration.
Carbon-rich soil holds water and nutrients well, supports higher yields and faster regrowth, and may qualify for soil-carbon programs.
47 g/kg soil organic carbon in the top 30 cm, loam texture, pH 5.7 (ISRIC SoilGrids).
Opportunityhigh confidence
A watercourse runs through the parcel.
On-site water supports irrigation, livestock, and habitat and can lower water-supply costs — though it may carry buffer or setback rules worth checking.
A mapped river or stream crosses the parcel (Lütschine).
Waterhigh confidence
Rainfall is moderate.
Water is adequate for many uses, but storage through the dry season improves reliability.
1,923 mm of rain per year. A watercourse crosses the parcel.
Watermedium confidence
This parcel is a position in a watershed, not an island.
What arrives here is decided upstream, and what happens here is felt downstream — land use on this parcel is water stewardship for everyone below it. Read the upstream land uses before trusting the water, and count the downstream neighbours before changing it.
its own water runs 3.5 km downstream of it (MERIT-Hydro screening hydrography).
Terrainhigh confidence
The land is flat.
Flat ground is easy to build on, farm, and mechanize, though low flat land can drain poorly and should be checked for waterlogging.
Mean elevation 574 m, mean slope 3°, 34 m of relief.
Terrainhigh confidence
The largest buildable bench is 7.28 ha.
This is the piece that decides what fits: a single footprint, its access, and its services all have to land on contiguous ground. Everything beyond it is a second site, not an extension of the first.
43% of the parcel lies at or under 10°; largest contiguous piece 7.28 ha at about 566 m; the ground faces north, away from the sun; read on ~10 m cells from the Terrarium DEM.
Biodiversitylow confidence
Little wildlife has been formally recorded here.
A low record count usually reflects limited survey effort rather than low biodiversity, so a ground survey is needed before drawing conclusions.
Only 12 biodiversity records nearby (GBIF, the global species-record archive).
Accesshigh confidence
Road and town access are close.
Good access lowers development and logistics costs but can raise encroachment pressure and land prices.
About 0.14 km to the nearest road, 1.3 km to Bönigen.
Accesslow confidence
Jurisdiction is part of the parcel.
Permits, zoning, water, and roads run through these offices — knowing who governs the land is the first step of every plan that touches it.
Schweiz/Suisse/Svizzera/Svizra · Bern/Berne · Verwaltungskreis Interlaken-Oberhasli · Bönigen — 2,535 people in the governing unit.