This 139-hectare parcel near Antap, Selemadeg, Tabanan is land with sound foundations and clear regenerative upside, scoring 59 out of 100. The reading that most shapes the work here is that this area is highly exposed to projected climate change by 2050. Its main strength is that a watercourse runs through the parcel. The first move: design to the 2050 climate projections rather than today's conditions.
Riskmedium confidence
This area is highly exposed to projected climate change by 2050.
Large shifts in temperature and rainfall can change what the land can support, so any plan should be built around the projected conditions, not current ones.
Projected change by 2050: +0.9 °C mean temperature, +14% rainfall. Exposure rated High.
Riskhigh confidence
This ground has a recorded seismic history.
Repeated strong earthquakes within reach shape how anything here should be built — seismic design codes, slope stability under shaking, and insurance all follow from it.
29 earthquakes ≥ M5 within 100 km in 50 years, strongest M6.3, most recent M5.2 in 2025 (USGS catalog).
Opportunityhigh confidence
A watercourse runs through the parcel.
On-site water supports irrigation, livestock, and habitat and can lower water-supply costs — though it may carry buffer or setback rules worth checking.
A mapped river or stream crosses the parcel (Tukad Balian).
Waterhigh confidence
Rainfall is high and supports rain-fed use.
There is enough water for most crops and forestry with little or no irrigation; dry-season storage still helps.
2,030 mm of rain per year. A watercourse crosses the parcel. The archive's 20-year trend reads about +47% — a swing that size deserves verification against local records before it informs any plan.
Watermedium confidence
This parcel is a position in a watershed, not an island.
What arrives here is decided upstream, and what happens here is felt downstream — land use on this parcel is water stewardship for everyone below it. Read the upstream land uses before trusting the water, and count the downstream neighbours before changing it.
its own water runs 10.8 km downstream of it (MERIT-Hydro screening hydrography).
Terrainhigh confidence
The land is flat.
Flat ground is easy to build on, farm, and mechanize, though low flat land can drain poorly and should be checked for waterlogging.
Mean elevation 55 m, mean slope 3°, 42 m of relief.
Terrainhigh confidence
The largest buildable bench is 124.44 ha.
This is the piece that decides what fits: a single footprint, its access, and its services all have to land on contiguous ground. Everything beyond it is a second site, not an extension of the first.
89% of the parcel lies at or under 10°; largest contiguous piece 124.44 ha at about 55 m; the ground faces south-west; read on ~10 m cells from the Terrarium DEM.
Biodiversitylow confidence
Little wildlife has been formally recorded on the parcel itself.
Life is being recorded around it, so the thin count inside the boundary reflects where people have looked, not what lives here. A ground survey is needed before drawing conclusions.
Only 12 biodiversity records inside the boundary; 120 within 1 km of it (GBIF, the global species-record archive).
Soilmedium confidence
Soil organic carbon is moderate.
The soil is workable but will benefit from cover cropping and organic inputs to build fertility before intensive use.
30.3 g/kg soil organic carbon in the top 30 cm, clay loam texture, pH 5.4 (ISRIC SoilGrids).
Accesshigh confidence
Road and town access are close.
Good access lowers development and logistics costs but can raise encroachment pressure and land prices.
About 0.05 km to the nearest road, 0.73 km to Antap.
Accesslow confidence
Jurisdiction is part of the parcel.
Permits, zoning, water, and roads run through these offices — knowing who governs the land is the first step of every plan that touches it.
Indonesia · Bali · Selemadeg.